EPF Commercial delivered and commissioned a temporary power plant to support construction and early operations at the Red Sea Project, meeting Red Sea Global’s safety and sustainability standards.
×
❮
❯
Equipment (Key Specs)
- JD-250 (250 kVA) — John Deere engine, Leroy-Somer alternator, sound-attenuated, prime-rated.
- DG-200 (3× 200 kVA) — Heavy-duty 6-cyl engines, Leroy-Somer alternators, parallel/synchronization ready.
- C-550 (550 kVA) — High-capacity unit for peak/critical loads, PowerCommand/DSE controls, Stamford/Leroy-Somer class alternators.
- Bunded bases, auto safety shutdowns, ATS integration, remote monitoring.
What We Did (Process)
- Logistics & Pads: Delivery, crane off-loading, alignment on reinforced concrete with anti-vibration mounts.
- Cabling & Fuel: LV feeders to MDB/ATS, control wiring for auto-start/sync; external tanks, spill-safe fuel lines.
- Pre-Start & Testing: Fluids/filters, insulation/torque checks, phase rotation; no-load checks, stepped load-bank tests, parallel run.
- Commissioning: ATS simulation, protections verification, burn-in run, handover & operator training.
Challenges & Mitigation
- Remote, sandy, coastal site: staged spares, corrosion-resistant hardware, upgraded filtration.
- Heat & dust: dawn/dusk heavy lifts, enhanced cooling, tighter PM schedule.
- Multi-contractor interface: locked lift windows, joint energization plans, daily coordination.
Safety Procedures
- Mandatory PPE, daily toolbox talks, LOTO for electrical works.
- Certified lifting gear, cordoned test zones, fire & spill kits on standby.
- Documented inspections and sign-offs at every stage.
Outcomes
- 1.4 MVA reliable prime power for camps, site utilities, cranes, and early facilities.
- Redundant configuration (3×DG-200) for uptime and maintainability.
- Zero-incident installation; schedule and quality targets met.
Sustainability & Innovation
- Right-sized, efficient gensets in low-noise canopies; bunded containment.
- Smart controls for load-based auto-start/stop and remote monitoring to reduce fuel burn.
- Designed as a bridge to future solar/battery microgrid—seamless ATS integration for backup role later.